• 中文侧试: There will be works carried out on the T1 Departure Roadway between 0130-0430 hrs from 22-25 May. Please follow the signs and drop off passengers at the T1 West Link (Level 1). Drivers are advised to drive slowly, look out for signs and set off earlier for the airport.  (中文侧试)

免责声明

我们竭尽全力确保所提供信息的正确性。表格显示的日期、时间和其他信息可能在无通知的情况下不时变动。 CAG 和/或其代理商、员工或承包商不对任何错误信息承担责任,因而也不以任何方式为不准确或错误的内容负责。建议用户在出行前直接咨询航空公司。